RWZI Echten
Plant size: 190.000 P.E. Throughput: 400 m³/d Commissioning: 2013
RWZI AMS-West
Plant size: 1.000.000 EW Throughput: 2.500 m³/d Commissioning: 2013
Metro Wastewater Reclamation
Plant size: 9.600 l/s Throughput: 3.750 m³/d Commissioning: 2020